What is the Kitchen cabinet installation process




1. Installation of base cabinet


First of all, the floor cabinet is installed. You want to clean the floor to ensure that the cabinet can be level with the floor, or the gap between the cabinet doors cannot be balanced. L-shaped base cabinet extends to both sides with the right angle as the reference point; U-shaped base cabinet extends to both sides from two right angles after being placed in order in the middle. After the ground cabinet is placed, it shall be leveled by adjusting the levelness to ensure that the cabinet is close to the cabinet.


2. Installation of hanging cabinet

After the installation of the ground cabinet is successful, install the hanging cabinet. Pay attention to the height when installing the cabinet, which is convenient for daily use. Generally, the distance between the cabinet and the floor is 65cm. Hanging cabinet installation also needs to connect the cabinet body to ensure the tightness of each other. In order to make the cabinet beautiful, it is necessary to adjust the level of the cabinet after installation.



3. Mounting Kitchen countertop

The countertop of the cabinet is made of several pieces of stone. Pay attention to the time and the amount of glue when installing. Generally, it takes half an hour in summer and 1-1.5 hours in winter. After bonding, polish and polish the surface to make it more beautiful.


4. Installation hardware

 

After the cabinet main body is installed, it is the installation of faucet, hardware basin, pull basket, etc. During the installation of the pull basket, attention shall be paid to avoid the falling of sawdust, etc.; during the installation of the water basin, attention shall be paid to the problem of water entering; in order to prevent water seepage, attention shall be paid to the sealing when connecting the pipeline and the water basin.


5. Installation of cooker appliances

When installing the range hood and range hood, pay attention to the height, which is convenient for daily cooking and taking things. Generally, the distance between the range hood and the range hood is 75cm to 80cm, and remember to align the two.


6. Adjust cabinet door

After the installation, adjust the cabinet door to ensure that there is no abnormal gap. Finally, check the cabinet and clean the kitchen.